Articles
How to Assign Manager when Creating a New Form for CGP
Who is responsible for submitting the NOI for EPA CGP coverage?
What if the extent of the common plan of development or sale is contingent on future activities?
Utah NeT PGP Training Recording and PowerPoint on Notice of Intent Submittal for PGP (video)
GEG - How to send a Flagged Structure back to Draft
Biosolid Annual Report: Reporting the average concentration of Total Nitrogen in the sewage sludge or biosolids that was applied to land during the compliance monitoring period for this SSUID
Biosolids - How to change your role in CDX
GMG Contacts
Guide to the E-Enterprise Portal
Region 10 NeT MS4 Training Material
How to Apply and Manage a Utah issued MSGP form
How to tell if a NOI/NOT was received
EPA's 2021 Multi-Sector General Permit (MSGP) for Industrial Stormwater Discharges (PDF)
NeT Aquaculture CDX Guides
What happens when I submit a waiver to report my 2018 MSGP Annual Report via paper?
What is the MSGP?
EPA NeT PGP Training Recording and PowerPoint on Annual Report Submittal for PGP (video)
Who Should use NeT-Biosolids
My site’s disturbances will occur in an area covered by EPA’s CGP and in an area covered under a state-issued construction stormwater permit. Do I need coverage under both the EPA-issued CGP and the state-issued permit?
MSGP Hold Triggers