Articles

My site’s disturbances will occur in an area covered by EPA’s CGP and in an area covered under a state-issued construction stormwater permit. Do I need coverage under both the EPA-issued CGP and the state-issued permit?

Structure Types and Limit Sets Table

Managing Aquaculture to Protect Water Quality - Video Overview

Creating a New CDX Account to Access NETMSGP (RHODE ISLAND USE ONLY)

I requested permissions for an NOI and haven't received a response. Why?

Permit Waivers for CGP

NeT - Sewer Overflow/Bypass Events Training Schedule

GovDelivery Email Subscription Requests

The previous landowner got permit coverage but then defaulted on the loan/ died/ is no longer with the industry. Can I use the NOI?

Roles and Permissions for NeT Biosolids

What if earth disturbance is a normal part of the post-construction use of the site?

Create and Submit MSGP Annual Report (RHODE ISLAND USE ONLY)

How to Submit a Change NOI for NeT PGP

MSGP Additional Implementation Measures (AIM) (PPT)

GEG - How to send a Flagged Structure back to Draft

Biosolid Annual Report: Reporting the average concentration of Total Nitrogen in the sewage sludge or biosolids that was applied to land during the compliance monitoring period for this SSUID

GEG - How to Revert or Cancel Flagged NOT

GEG - How to Deactivate Operator

CGP REF Table - Indian Country List

Guide to the E-Enterprise Portal