Articles
CGP NeT Notification Table
How to Perform an Automatic Transfer for MSGP coverage by Transfer Action (transfer ownership) (RHODE ISLAND USE ONLY)
Structure Types and Limit Sets Table
Who is responsible for submitting the NOI for EPA CGP coverage?
GMG290000 (EPA Region 6 Outer Continental Shelf NPDES Permit)
GEG - How to Create and Flag Structure for Certification
Utah NeT PGP Training Recording and PowerPoint on Notice of Intent Submittal for PGP (video)
Administrative Continuance of the 2015 MSGP and No Action Assurance for New Facilities
What if earth disturbance is a normal part of the post-construction use of the site?
Helpful Information When Creating a New NOI or NOE as a Preparer
Create and Submit MSGP Annual Report (RHODE ISLAND USE ONLY)
How to Terminate Operator
How to retrieve a Copy of Record (COR) for any NeT program in CDX
How to Flag Multiple Structures for Certification
GEG - How to send a Flagged Structure back to Draft
CDX Guide: New and Returning Users (PDF)
Biosolid Annual Report: Reporting the average concentration of Total Nitrogen in the sewage sludge or biosolids that was applied to land during the compliance monitoring period for this SSUID
Types of construction activities required to obtain NPDES permit coverage for their stormwater discharges
GEG - How to Revert or Cancel Flagged NOT
NeT PGP Introductory Feature Overview Factsheet