Articles

GMG290000 (EPA Region 6 Outer Continental Shelf NPDES Permit)

GEG - How to Create and Flag Structure for Certification

MSGP FAQs (Multi-Sector General Permit)

Administrative Continuance of the 2015 MSGP and No Action Assurance for New Facilities

GMG - How to Renew Administratively Continued Permit

What if earth disturbance is a normal part of the post-construction use of the site?

Helpful Information When Creating a New NOI or NOE as a Preparer

Create and Submit MSGP Annual Report (RHODE ISLAND USE ONLY)

How to Terminate Operator

How to retrieve a Copy of Record (COR) for any NeT program in CDX

How to Flag Multiple Structures for Certification

GEG - How to send a Flagged Structure back to Draft

CDX Guide: New and Returning Users (PDF)

Biosolid Annual Report: Reporting the average concentration of Total Nitrogen in the sewage sludge or biosolids that was applied to land during the compliance monitoring period for this SSUID

Types of construction activities required to obtain NPDES permit coverage for their stormwater discharges

GEG - How to Revert or Cancel Flagged NOT

Biosolids - How to change your role in CDX

How to Create an MSGP No Discharge Certification (NDC) (FOR RHODE ISLAND USE ONLY)

How to create a Utah MSGP account in CDX

NeT-GMG Training Schedule